Custom design mold tooling of your stainless steel bottle tumbler

Ecoway Houseware Limited offer OEM manufacturing services for your unique custom design mold of stainless steel bottle tumbler which require new tooling, our engineer offer design supports for your product concept design from CAD drawing to make prototype sample, test sample, trial run production sample for your review and approval before mass production.

1. Sketch Drawing

How to made custom design stainless steel bottle

2. Product Image

01 5 tips made stainless steel water bottle tumbler

3.Product Sample

custom bottle design product image

the custom mold tooling bottle projects

Unique custom design shape water bottle with special features is welcome, we are here to listen your inquiry and will working hardly to have fast feedback with good advice for your team, let’s have a chat to start from “0” concept design to the final market.

need an exclusive manufacturer factory for your custom design water bottle

Your custom stainless steel bottle tumbler manufacturer factory in china

Custom Design Mold Bottle Tumbler Tooling Processes

Step 1: NDA (non-disclosure agreement)

We sign NDA with your company before release any confidential information of your custom design bottles, such as sketch drawing, image, prototype sample etc.

Step 2: design drawing or Drawing modification advice

Based on your custom design bottle requirements and progress, our engineer team offer design supports to complete your bottle product design drawing, or have modification advice for your product team to finish the design drawing.

Step 3: quotation

After finish and approve the design drawing, we quoted the prototype sample cost, sample lead time, custom tooling cost, tooling lead time, product cost, production lead time for your approval.

Step 4. payment and sample making

We receive payment of samples then start the sample making process and send samples for your approval:

1. Custom prototype  sample: 10 days

2. Custom tooling sample: 30~45 days

3. Custom color sample: 10 days

Sample shipment via express DHL, FFDEX, UPS, TNT around 7 days on the road to EU & USA, 4 days to AU & KOREA & Japan.

Step 5. Production & inspection

After receive deposit payment, we start mass production which usually takes 30 days lead time.During mass production, our quality department conduct in-process inspection and test, also have final pre-shipment inspection for customer review.

Step 6. final payment & shipment

After receive final payment, we cooperate with your forwarder to book the shipment, cargo will arrive at your warehouse around 10 days by air shipment 40 days by sea shipment.

Leave Your Questions & Needs Here

Our supports team will have feedback for you within 1 working day!

Come To Visit Our Company

Contact us for your custom design stainless steel bottle tumbler exclusive manufacturer factory in China

Working hours

Monday- Friday:8:00-18:30 Hrs
(Phone until 17:30 Hrs)

We are here

NO.111, SHIZHU TOWN, YONGKANG CITY, CHINA
Tell:+86 579 8384 2163
Email: [email protected]

Leave Your Questions & Needs Here

Free Sample & E-catalogue is available!